Documents sorted by SEQ in Ascending Order within category

B - Budget/Cost/Financial Related Documents21 documents

  • B-001 June Budget Report
    document seq 0.00
    Budget Report as of June 5, 2014
  • B-002 D&C Invoice 4369
    document seq 0.00
    Invoice 4369, Destefano and Chamberlain
  • B-003 Invoice-Test Boring
    document seq 0.00
    Invoice for test borings under the pavilion
  • B-004 July Available Funding Report
    document seq 0.00
    Available Project Funding As Of July 8, 2014
  • B-005 July Budget Report
    document seq 0.00
    Budget Report as of July 8, 2014
  • B-006 September Budget Report
    document seq 0.00
    Budget report as of September 11th, 2014
  • B-007 Penfield Pavilion Funding document from DPW
    document seq 0.00
    Document from DPW dated 8/14/2014 outlining funding options available for the Penfield Pavilion repair project.
  • B-008 D&C Invoice 4496
    document seq 0.00
    Invoice 4496, Destefano and Chamberlain
  • B-009 D&C Invoice 4556
    document seq 0.00
    Invoice 4556, DeStefano and Chamberlain
  • B-010 September Budget Report
    document seq 0.00
    Available Project Funding As Of September 8, 2014
  • B-011 Shawmut Option 7 DD Estimate 9.18.14
    document seq 0.00
    Shawmut (CM) estimate of Option 7 DD Design as of 9.18.14
  • B-012 Shawmut Option 8,9 SD Estimate 9.18.14
    document seq 0.00
    Shawmut (CM) estimate of Options 8 & 9 SD designs as of 9.18.14
  • B-013 D&C Invoice 4619
    document seq 0.00
    DeStefano & Chamberlain (Design/Engineering) invoice from 09.24.14
  • B-014 Shawmut Invoice 140543-1
    document seq 0.00
    Shawmut (CM) invoice
  • B-015 Shawmut Invoice 140543-1B
    document seq 0.00
    Shawmut (CM) invoice
  • B-016 October Budget Report
    document seq 0.00
    PBC budget report through 10.9.14
  • B-017 JMA Pavilion Re-Inspection Survey
    document seq 0.00
    JM Albaine Proposal (approved) to re-inspect and report the current state of the pavilion
  • B018_Shawmut_Bid_Update_150730
    document seq 0.00
    Update on construction bids received as of 7/30/15 meeting
  • B019_Shawmut_GMP_Proposal_DRAFT_151008
    document seq 0.00
    DRAFT proposal for Guaranteed Maximum Price. NOT approved by Penfield Building Committee
  • B020_Shawmut_GMP_Proposal_FINAL_151022
    document seq 0.00
    Final GMP, approved by PBC Committee
  • B021_Shawmut_Overall_Initial_Project_Budget_151022
    document seq 0.00
    Overall project cost which includes Owner soft costs

C - General Correspondence Received or Sent by the Committee53 documents

  • C-001 Email from Rick Grauer - 12-15-13
    document seq 0.00
  • C-002 Letter from Parks & Recreation Commission - 11-20-13
    document seq 0.00
  • C-003 Letter from D. Dmochowski 6-19-14
    document seq 0.00
    Letter from D. Dmochowski on raising bulkhead to 15 ft.
  • C-004 Letter from J. Reber 7-8-14
    document seq 0.00
    Letter from J. Reber on need to repair the bulkhead
  • C-005 PBC Options Summary 7-16-14
    document seq 0.00
    A memo by J. Bradley summarizing the options review as presented to Parks and Rec. Commission
  • C-006 Comments from K. Camarro 7-10-14
    document seq 0.00
    Comments From K. Camarro on proposed repairs 7-10-14
  • C-007 Move Restoration Forward
    document seq 0.00
    Comments from K. Camarro on pavilion repairs 12-30-13
  • C-008 Letter from Parks Rec November 2013
    document seq 0.00
    Letter from the Parks and Recreation Commission to the PBC, November 2013
  • C-009 PBC Status Briefing to BOS 8-6-2014
    document seq 0.00
    Briefing memo for the BOS Meeting scheduled for 8-6 14, to provide committee recommendation for review and approval.
  • C-010 PBC Handouts For BOS 8-6-14
    document seq 0.00
    Copies of the drawings that are part of the BOS presentation for 8-6-14. The drawings are based on those previously presented to the PBC with the addition of one describing the existing conditions in section.
  • C-011 Statement by Ian Bass 6-26-14
    document seq 0.00
    A statement read by Ian Bass to the committee on June 26, 2014 regarding the emails solicited by the First Selectman concerning the options for the Penfield Pavilion
  • C-012 Letter from WSapone 8-14-14
    document seq 0.00
    Resignation letter by Secretary William Sapone presented to the committee on 8-14-14
  • C-013 Relocation Option Photo 8-14-14
    document seq 0.00
    Photograph showing possible relocation option presented by W. Sapone on 8-14-14
  • C-014 Chairman Memo to PBC Design and CM Team
    document seq 0.00
    Update memo dated 8/20/2014 from Chairman Bradley to DeStefano & Chamberlin (Design/Engineering) and Shawmut (CM)
  • C-015 CDBG-DG Grant Clarification
    document seq 0.00
    CT Department of Housing response to I. Bass (Committee Member) inquiry on allocation of block grants with respect to homeowner grant funding
  • C-016 - Chairman Memo to First Selectman Regarding Presentation Postponement
    document seq 0.00
    Chairman Bradley memo to the First Selectman regarding the postponement of PBC presentation to RTM
  • C-017 Chairman Statement to Fairfield BHA
    document seq 0.00
    Chairman Bradley's presentation memo to the Fairfield Beach Homeowners Association on September 10th
  • C-018 Fairfield Taxpayer Letter
    document seq 0.00
    Fairfield Taxpayer Group letter regarding Penfield Pavilion rebuilding/repair
  • C-019 J. Reber Correspondence 8.19.14
    document seq 0.00
  • C-020 R. Dmochowski Correspondence 8.21.14
    document seq 0.00
  • C-021 K. Camarro Correspondence 8.28.14
    document seq 0.00
  • C-021 K. Camarro Correspondence 8.28.14-2013 06 23 Ffld Beach
    document seq 0.00
  • C-021 K. Camarro Correspondence 8.28.14-Comments to Penfield Pavilion Building Committee August 28 (2)
    document seq 0.00
  • C-022 J Pierz Correspondence 9.6.14
    document seq 0.00
  • C-022 M. Mellor Correspondence 9.5.14
    document seq 0.00
  • C-023 D Christie Correspondence 9.10.14
    document seq 0.00
  • C-023 D Christie Correspondence 9.10.14-Christie%2c Donald - Letter to Penfield Building Committee - Received September 10 2014
    document seq 0.00
  • C-024 A Israel Correspondence 9.14.14
    document seq 0.00
  • C-025 K Camarro Correspondence 9.15.14
    document seq 0.00
  • C-025 K Camarro Correspondence 9.15.14-2013 06 23 Ffld Beach
    document seq 0.00
  • C-025 K Camarro Correspondence 9.15.14-Penfield Pavilion – Building a Town Board-by-Board and Brick-by-Brick
    document seq 0.00
  • C-026 M LeClerc & K Camarro Correspondence 9.22.14
    document seq 0.00
  • C-027 R Dmochowski Correspondence 9.24.14
    document seq 0.00
  • C-027 R Dmochowski Correspondence 9.24.14-7.25.14 email re timber blkhd
    document seq 0.00
  • C-027 R Dmochowski Correspondence 9.24.14-Dmochowski Comments to PBC 080514
    document seq 0.00
  • C-027 R Dmochowski Correspondence 9.24.14-RSD ltr re BLKHD to PBC 061914
    document seq 0.00
  • C-028 R Grauer Correspondence 9.24.14
    document seq 0.00
  • C-029 K Camarro Correspondence 9.25.14
    document seq 0.00
  • C-030 J Reber Correspondence 9.25.14
    document seq 0.00
  • C-030 J Reber Correspondence 9.25.14-FT PENFIELD PAVILION FINAL
    document seq 0.00
  • C-031 R Jacobs Correspondence 10.01.14
    document seq 0.00
  • C-031 R Jacobs Correspondence 10.01.14-01_tpz
    document seq 0.00
  • C-032_R_Grauer_Correspondence_10.26.14-01
    document seq 0.00
  • C-032_R_Grauer_Correspondence_10.26.14-02-Pics
    document seq 0.00
  • C-033_A_Israel_Correspondence_10.29.14
    document seq 0.00
  • C-034_J_Reber_Correspondence-11.05.14
    document seq 0.00
  • C-035_A_Finkle-11.20.14
    document seq 0.00
  • C-036_J_Reber_01.21.15
    document seq 0.00
  • C-037_D_Dmochowski_01.22.15
    document seq 0.00
  • C-038_R_Grauer_01.23.15
    document seq 0.00
  • C-039_D_Dmochowski_F&ECB to PBC regarding bulkhead 9.18.15
    document seq 0.00
    Letter from Flood & Erosion Control Board regarding Timber Bulkhead Improvements
  • C-040_Pullman_Comley_Bond_Reallocation_Opinion_151013
    document seq 0.00
    Opinion from Bond Counsel regarding reallocation of General Sandy Repair Bond funding
  • C-041-Stanton_Letter-Requirements_for_CDBG
    document seq 0.00
    Letter from Town Attorney regarding the design requirements for receiving the CDBG

D - Documents Presented to or Reviewed by the Committee75 documents

  • D-001 Charge
    document seq 0.00
    Charge to the Building Committee Approved by the Board of Selectmen on October 16 2013
  • D-002 TBCSC Report
    document seq 0.00
    Report governing building committee procedures in the Town of Fairfield
  • D-003 Pavilion Condition Survey
    document seq 0.00
    Condition survey of the Penfield Pavilion dated June 17, 2013
  • D-004 Geotech Engineering Report
    document seq 0.00
    Engineering report on pile types, soil classification and subsurface conditions
  • D-005 Data Calculations
    document seq 0.00
    Data collected to support engineering report D-0004 above comparing pile wave loadings with 12" round, 12" square and 8" round piles
  • D-006 Pavilion Pier Drawing
    document seq 0.00
    Pavilion drawing showing damaged piling areas
  • D-007 Conceptual Dune Drawing
    document seq 0.00
    Drawing of possible dune construction in front of the pavilion
  • D-008 Relocation Option
    document seq 0.00
    Drawing illustrating a possible relocation of the pavilion
  • D-009 Footing Drawings
    document seq 0.00
    Drawings of a possible footing plan with footing details
  • D-010 FEMA Information
    document seq 0.00
    FEMA information with illustrations
  • D-011 Engineering Report with Photos
    document seq 0.00
    Engineering report with photographs of conditions after Sandy, and showing steps taken to stabilize the footings
  • D-012 Engineering Report post Irene
    document seq 0.00
    Engineering report on evaluations to be conducted after Irene
  • D-013 Engineering Report post Irene
    document seq 0.00
    Engineering report on trusses, footings and calculations of load beam capacity and predicted settlement
  • D-014 Engineering Report post Irene
    document seq 0.00
    Engineering report on footing conditions after scouring, on status of trusses and shear wall performance
  • D-015 Engineering Report post Irene
    document seq 0.00
    Report on the shear wall modifications
  • D-016 Engineering Report post Irene
    document seq 0.00
    Report on the shear wall modifications
  • D-017 Engineering Report post Irene
    document seq 0.00
    Report on the shear wall modifications
  • D-018 Case Studies on Shoreline Erosion
    document seq 0.00
    Shoreline issues and solutions implemented in other shore areas
  • D-019 Drawing of Repair Plan
    document seq 0.00
    Modified pavilion drawings showing possible repair plan
  • D-020 Report from Flood and Erosion Control Board
    document seq 0.00
    Report by flood and erosion on area conditions and storm effects
  • D-021 Report from Conservation Department
    document seq 0.00
    Report by conservation on history of area, including a review of changing flood and erosion issues
  • D-022 Report from Public Works Department
    document seq 0.00
    Report by public works on area elevations and flooding issues, damage to the pavilion and bulkhead construction
  • D-023 Prior Pavilion Flooding Photos
    document seq 0.00
    Photographs after area flooding due to a nor'easter
  • D-024 Pavilion Flooding during Irene
    document seq 0.00
    Photographs from Storm Irene
  • D-025 Engineering Report on Current Conditions May 2014
    document seq 0.00
    Engineering report on the current condition of the pavilion, rejecting temporary use of limited designated areas.
  • D-026 Engineering Report 5-28-14
    document seq 0.00
    Engineering report on removing glass panels and on building settling
  • D-027 Engineering Report 6-10-14
    document seq 0.00
    Engineering Report on glass removal and protection process
  • D-028 Shawmut Estimate 6-30-14
    document seq 0.00
    Shawmut Estimates for Options 1 through 7
  • D-029 Shawmut Schedules 6-30-14
    document seq 0.00
    Shawmut Schedules for Options 1-7
  • D-030 Summary Letter from Engineer
    document seq 0.00
    K. Chamberlain summary of PBC meeting discussions 6-27-14
  • D-031 Report on Test Borings 7-10-14
    document seq 0.00
    Report by the engineer on the results of under-pavilion test borings 7-10-14
  • D-032 Email from Engineer on Separate Building Option 7-2-14
    document seq 0.00
    Results of discussion with J. Wendt concerning separating the locker wing
  • D-033 Email from Engineer on Final Options 7-10-14
    document seq 0.00
    Engineer email on the final option 7-10-14
  • D-034 Side View Drawings for Option 7
    document seq 0.00
    Drawings showing the proposed option 7 in profile
  • D-035 Plan View Drawing for Option 7
    document seq 0.00
    Plan view drawing of Option 7
  • D-036 Engineering Report on all Options 6-12-14
    document seq 0.00
    Engineering Report reviewing all options 6-12-14
  • D-037 Revised Site Plan for Option 7
    document seq 0.00
    Revised site plan for option 7 as of 7-24-14
  • D-038 Elevator Study
    document seq 0.00
    An elevator study discussed at the July 24 PBC meeting
  • D-039 Bulkhead Photos Post Sandy
    document seq 0.00
    Photographs showing the beach and bulkhead post Sandy, October 2012
  • D-040 JM Albaine Option Presentation Feb 2014
    document seq 0.00
    Presentation on the pavilion condition and options for repairs made by the engineer, J.M Albaine to the PBC on Feb. 20, 2014
  • D-041 Shawmut Pavilion Presentation
    document seq 0.00
    Shawmut initial presentation of options with an informative bar chart, rough first estimates and site photographs-May 15, 2014
  • D-042 Pavilion Design Development Issue
    document seq 0.00
    DeStefano & Chamberlain Design Development issue drawings for Penfield Pavilion "Option 7"
  • D-043_Penfield_Presentation_Master-141030_(2)
    document seq 0.00
    Final pdf presentation for the Committee recommended Option 7, October 30, 2014** (note: same as Power Point presentation)
  • D-043_Penfield_Presentation_Master-141030_(2).pptx
    document seq 0.00
    Final Power Point presentation for the Committee recommended Option 7, October 30, 2014
  • D-044 PBC Report to the BOS 10-30-2014
    document seq 0.00
    Chairman's executive summary of the process and committee's recommended Option 7
  • D-045 Shawmut Summary 141030-Full Booklet
    document seq 0.00
    Cost comparison document of four of the options considered
  • D-046_JMA Eng'g FINAL Report Fairfield Pavilion ReInspection Nov 20 2014
    document seq 0.00
    Final report of the re-inspection of the state of Penfield Pavilion since the initial storm damage inspection
  • D-047_Wiles_Pavilion_Option 9_141219
    document seq 0.00
    Alternate scheme for Option 9 provided by G. Wiles
  • D-048_Wiles_Budget_Adjusted_141230
    document seq 0.00
    Budget commentary/projection by G. Wiles for Option 9
  • D-049_Wiles_Pavilion_Option_7A_141230
    document seq 0.00
    Alternate scheme for Option 7A provided by G. Wiles
  • D-050_PBC Option 1 Summary 1-6-2015
    document seq 0.00
    One page summary of Option 1
  • D-050_PBC Option 7 Summary 1-6-2015
    document seq 0.00
    One page summary of Option 7
  • D-050_PBC Option 7A Summary 1-6-2015
    document seq 0.00
    One page summary of Option 7A
  • D-050_PBC Option 8 Summary 1-6-2015
    document seq 0.00
    One page summary of Option 8
  • D-050_PBC Option 9 Summary 1-6-2015
    document seq 0.00
    One page summary of Option 9
  • D-051_DD Budget Pavilion Option-7A of 11.18.2014R Project Final
    document seq 0.00
    Revised side-by-side cost comparison sheet provided by Shawmut
  • D-052_Penfield Presentation Master January 2015 v5
    document seq 0.00
    RTM Presentation for 1/20, 1/21, 1/26 meetings
  • D-053_Penfield Pavilion - D&C Documents for 3-12-2015 meeting
    document seq 0.00
    DRAFT design update from DeStefano & Chamberlain
  • D-054_PBC - Design Issues List - 3-26-2015
    document seq 0.00
    Running list of ongoing design commentary
  • D-054_Penfield Mechanical report - 3-26-2015
    document seq 0.00
    Report from HVAC constant Hofbauer Associates on existing conditions
  • D-054_Penfield Pavilion DD Set 3-26-2015
    document seq 0.00
    PROGRESS set for Committee comment
  • D-054_Renderings 3-27-2015
    document seq 0.00
    PROGRESS renderings for Committee comment
  • D-054_Square footage comparison 3-26-2015
    document seq 0.00
    Comparison of existing sq footage and proposed sq footage IN PROGRESS
  • D-055_Flood Control Alternatives - RACE 4-24-15
    document seq 0.00
    Flood Control Alternatives for discussion proposed by RACE
  • D-055_PBC - Design Issues List - 4-30-2015
    document seq 0.00
    Ongoing design issues tracking log
  • D-055_Penfield - color 11x17 plan - 4-30-2015
    document seq 0.00
    First Floor Plan rendered
  • D-055_Penfield AE fees 4-30-2015
    document seq 0.00
  • D-055_Penfield Pavilion 50CD set 4-30-2015
    document seq 0.00
    50% Construction Document issue by Destefano & Chamberlain for PBC review and comment
  • D-056_Penfield Pavilion - Option 7A 2015-04-30 - First 90 days
    document seq 0.00
    First 90 Days" of construction mobilization and activity
  • D-056_Penfield Pavilion - Option 7A 2015-04-30
    document seq 0.00
    Updated project schedule as of 4/30/15
  • D-056_PP Budget 5115
    document seq 0.00
    Current project cost estimate as of 5/1/15
  • D-057_PENFIELD PAVILION - 6-12-2015 BID SET - DRAWINGS
    document seq 0.00
    Full Set of Drawings for Bidding Purposes
  • D-057_PENFIELD PAVILION - 6-12-2015 BID SET - SPECIFICATIONS
    document seq 0.00
    Full Set of Specifications for Bidding Purposes
  • D-058-DEEP_Letter_to_Fairfield-20160415
    document seq 0.00
  • D-059-Penfield_Bulkhead_Summary-20160512
    document seq 0.00

O - Other35 documents

  • 001-Penfield 03-01-2016 DC Report #1
    document seq 0.00
  • 002-Penfield 03-02-2016 DC Report #2
    document seq 0.00
  • 003-Penfield 03-04-2016 DC Report #3
    document seq 0.00
  • 004-Penfield 03-08-2016 DC Report #4
    document seq 0.00
  • 005-Penfield 03-10-2016 DC Report #5
    document seq 0.00
  • 006-Penfield 03-15-2016 DC Report #6
    document seq 0.00
  • 007-Penfield 03-16-2016 DC Report #7
    document seq 0.00
  • 008-Penfield 03-21-2016 DC Report #8
    document seq 0.00
  • 009-Penfield 03-21-2016 DC Report #9
    document seq 0.00
  • 010-Penfield 03-22-2016 DC Report #10
    document seq 0.00
  • 011-Penfield 03-24-2016 DC Report #11
    document seq 0.00
  • 012-Penfield 03-29-2016 DC Report #12
    document seq 0.00
  • 013-Penfield 04-01-2016 DC Report #13
    document seq 0.00
  • 014-Penfield 04-05-2016 DC Report #14
    document seq 0.00
  • 015-Penfield 04-07-2016 DC Report #15
    document seq 0.00
  • 016-Penfield 04-08-2016 DC Report #16
    document seq 0.00
  • 017-Penfield 04-12-2016 DC Report #17
    document seq 0.00
  • 018-Penfield 04-13-2016 DC Report #18
    document seq 0.00
  • 019-Penfield 04-14-2016 DC Report #19
    document seq 0.00
  • 020-Penfield 04-15-2016 DC Report #20
    document seq 0.00
  • 021-Penfield 04-18-2016 DC Report #21
    document seq 0.00
  • 022-Penfield 04-19-2016 DC Report #22
    document seq 0.00
  • 023-Penfield 04-20-2016 DC Report #23
    document seq 0.00
  • 024-Penfield 04-22-2016 DC Report #24
    document seq 0.00
  • 025-Penfield 04-25-2016 DC Report #25
    document seq 0.00
  • 026-Penfield 04-26-2016 DC Report #26
    document seq 0.00
  • 027-Penfield 04-28-2016 DC Report #27
    document seq 0.00
  • 027-Penfield 04-29-2016 through 06-03-2016 DC Report #28-43
    document seq 0.00
  • 028-Penfield - Final Pile Driving Summary Report - 5-31-2016
    document seq 0.00
  • 029-PILE NUMBERING PLAN
    document seq 0.00
  • 030-Penfield_06-14-2016_through_07-20-2016_DC_Report_#46-67.pdf
    document seq 0.00
  • 031-Penfield_06-07-2016_through_06-09-2016_DC_Report_#44-45.pdf
    document seq 0.00
  • 032-Penfield 07-26-2016_through_09-29-2016_DC Report #68-86
    document seq 0.00
  • O-001 PBC 2014 Meeting Dates - Revised
    document seq 0.00
    PBC Meeting Dates
  • O-017 PBC 2016 Meeting Schedule
    document seq 0.00